Infrastructure
Lielvārde
-
2021
The project involves the renovation of the large hall (400 seats) of the Lielvārde Cultural Center after the reconstruction of the roof structure, improving its visual image, functionality, and safety. The aim is to create a modern, acoustically high-quality event space while preserving the existing hall layout.
As part of the renovation, the hall's interior will be completely revamped. A new floor will be constructed along with acoustically designed wall and ceiling finishes, using drywall structures, MDF panels, and wooden diffusers integrated with a new lighting solution. The stage floor covering and drapery will also be renewed.
The project also includes the adaptation of the hall's internal engineering systems (ventilation, power supply, low-current systems) to the new interior and modern requirements, without affecting the building's load-bearing structures or façade.
As a result, the large hall of the Lielvārde Cultural Center will gain a new lease of life, providing a quality acoustic and visual experience for event visitors and artists in a safe and modern environment.